ADU Construction in Keyes
ADU builder in Keyes, CA: detached and attached ADUs, garage conversions and junior ADUs. Permits handled, free estimates. Call (209) 843-6831.
Our technicians serve Keyes and are typically on-site within 60 minutes of your call.
An accessory dwelling unit (ADU) adds a complete, permitted living space on the lot you already own: room for aging parents or grown kids, a home office, or rental income that helps cover the mortgage. TDI® builds ADUs in Keyes and across Stanislaus County, and manages each project from the first site review to the final inspection under one contract.
ADUs we build in Keyes
- Detached ADUs, a standalone backyard cottage with its own foundation, kitchen, bathroom and entrance
- Attached ADUs, a new unit built onto the existing home with its own entrance
- Garage conversions, turning an attached or detached garage into a full living unit
- Junior ADUs, up to 500 square feet carved out of existing space inside the home, with an efficiency kitchen and a separate entrance
- Above-garage units, where the lot and local rules allow it
Building an ADU in Keyes
Keyes is a small unincorporated community in Stanislaus County along Highway 99 between Ceres and Turlock, with modest single-family homes and farmland nearby.
Most Keyes lots can fit at least one type of ADU. A detached unit works where the backyard has room, while a garage conversion reuses an existing structure and is often the fastest path to a permitted unit.
Older homes often need an electrical service upgrade to carry a second unit, and sewer and water lines may need to be replaced or upsized for the new connection. We check the panel, the sewer lateral and the water service early so those costs are in the estimate, not a surprise during construction.
Northern San Joaquin Valley summers regularly pass 100 degrees, and winters bring tule fog and rain. We design ADUs to California Title 24 energy standards, with insulation, window placement and a properly sized heating and cooling system so the unit stays comfortable year round.
How an ADU project works with TDI®
- Site and zoning review. We look at your lot, setbacks, utilities and access before anything is drawn, so the design fits what can be permitted.
- Design and drawings. We coordinate floor plans and construction drawings sized to your goals and budget.
- Permits and plan check. We submit the application to the Stanislaus County Building Permits Division, answer plan check comments and track the permit through approval.
- Construction. Foundation, framing, roofing, plumbing, electrical and HVAC, insulation to Title 24, then drywall, cabinets, fixtures, flooring and finishes.
- Final inspection and walkthrough. We close the permit and walk the finished unit with you, so you have a legal, insurable, rentable space.
Licensed and accountable
- CSLB licensed general contractor, License #1041773, Class B General Building
- Native American owned (Cherokee) and a certified Minority Business Enterprise
- Building in Northern California since 1983
Thinking about an ADU in Keyes? Call us for a site review and a free written estimate.
Serving Keyes — ★ 5.0 · 9 Google reviews
“Spoke with Alex and she was pleasant and helpful while making appointment for me.” — John, May 2026
ADU Construction in Keyes: Service Coverage
Frequently Asked Questions
How fast can you arrive for adu construction in Keyes?
Can I build an ADU on my property in Keyes?
How big can an ADU be?
Is a garage conversion cheaper than a new detached ADU?
How long does an ADU take to build in Keyes?
Is TDI® licensed and insured?
Will my homeowners insurance cover adu construction in Keyes?
ADU Construction response in Keyes
Most Keyes calls see a technician on-site within 60 minutes of your call.